IMPROVING THE EFFECTIVENESS AND IMAGE OF THE BUILDING AND CIVIL ENGINEERING PROCESS BY USING AN AWARD POINT SYSTEM IN THE AWARD OF CONTRACTS

Authors

  • Kobus Grobler Postgraduate Student Engineering Management, Faculty of Engineering, Rand Afrikaans University
  • Leon Pretorius Faculty of Engineering, Rand Afrikaans University, Research Group for Engineering and Technology Management
  • Alwyn Strauss Faculty of Engineering, Rand Afrikaans University, Research Group for Engineering and Technology Management

DOI:

https://doi.org/10.7166/13-1-317

Abstract

ENGLISH ABSTRACT: One of the main causes leading to the perceived ineffectiveness and poor image of the building and civil engineering process seems to be the fact that clients often use lowest price as the only selection criterion in the award of contracts. One of the main recommendations of the doctoral research thesis of Grobler [1] is the introduction of an award point system that not only compares bidders on price, but also on their previous records of: quality of work, management ability and relations with other role players.

AFRIKAANSE OPSOMMING: Een van die hoof oorsake wat aanleiding gee tot die persepsie dat die bou-en siviele ingenieursweseproses oneffektief is en

Downloads

Download data is not yet available.

Downloads

Published

2011-11-05

How to Cite

Grobler, K., Pretorius, L., & Strauss, A. (2011). IMPROVING THE EFFECTIVENESS AND IMAGE OF THE BUILDING AND CIVIL ENGINEERING PROCESS BY USING AN AWARD POINT SYSTEM IN THE AWARD OF CONTRACTS. The South African Journal of Industrial Engineering, 13(1). https://doi.org/10.7166/13-1-317

Issue

Section

General Articles

Most read articles by the same author(s)

1 2 > >>