THE USE OF EARNED VALUE MANAGEMENT FOR INITIATING DIRECTIVE PROJECT CONTROL DECISIONS: A CASE STUDY
DOI:
https://doi.org/10.7166/27-1-1260Keywords:
Earned Value Management (EVM), Construction projectsAbstract
With large infrastructure backlogs in Africa, well-controlled projects will play a significant role in African infrastructure development. In this paper, the monitoring and/or directive use of Earned Value Management (EVM) is investigated and linked to project management maturity. This case study also investigates the use of EVM based on the financial and schedule risk distribution among project role players, and the effect of EVM on project performance. The results show minimal use of EVM in the directive control of projects; at best, the directive use of EVM is found to be implied rather than deliberate and methodical.
Downloads
Download data is not yet available.
Downloads
Published
2016-05-10
How to Cite
Nkiwane, N. H., Meyer, W. G., & Steyn, H. (2016). THE USE OF EARNED VALUE MANAGEMENT FOR INITIATING DIRECTIVE PROJECT CONTROL DECISIONS: A CASE STUDY. The South African Journal of Industrial Engineering, 27(1), 192–203. https://doi.org/10.7166/27-1-1260
Issue
Section
Case Studies
License
Authors who publish in the Journal agree to the following terms:- Authors retain copyright and grant the Journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the Journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this Journal.