TOUR CONSTRUCTION HEURISTICS FOR AN ORDER SEQUENCING PROBLEM

Authors

  • AP de Villiers Department of Logistics, Stellenbosch University
  • J Matthews Department of Logistics, Stellenbosch University
  • SE Visagie Department of Logistics, Stellenbosch University

DOI:

https://doi.org/10.7166/23-3-511

Abstract

An order picking system that requires pickers to move in a clockwise direction around a picking line with fixed locations is considered. The problem is divided into three tiers. The tier in which orders must be sequenced is addressed. Eight tour construction heuristics are developed and implemented for an order picking system operating in unidirectional picking lines. Two classes of tour construction heuristics

Downloads

Download data is not yet available.

Downloads

Published

2012-12-03

How to Cite

de Villiers, A., Matthews, J., & Visagie, S. (2012). TOUR CONSTRUCTION HEURISTICS FOR AN ORDER SEQUENCING PROBLEM. The South African Journal of Industrial Engineering, 23(3), 56–67. https://doi.org/10.7166/23-3-511

Issue

Section

General Articles