COMPARISONS BETWEEN AND COMBINATIONS OF DIFFERENT APPROACHES TO ACCELERATE ENGINEERING PROJECTS
DOI:
https://doi.org/10.7166/14-2-266Abstract
ENGLISH ABSTRACT: In this article, traditional project management methods such as PERT and CPM, as well as fast-tracking and systems approaches, viz. concurrent engineering and critical chain, are reviewed with specific reference to their contribution to reducing the duration of the execution phase of engineering projects. Each of these techniques has some role to play in the acceleration of project execution. Combinations of approaches are evaluated by considering the potential of sets consisting of two different approaches each. While PERT and CPM approaches have been combined for many years in a technique called PERT/CPM, new combinations of approaches are discussed. Certain assumptions inherent to PERT and often wrong are not made by the critical chain approach.
AFRIKAANSE OPSOMMING: In hierdie artikel word tradisionele projekbestuurbenaderings soos PERT en CPM asook projekversnelling en stelselbenaderings, naamlik gelyktydige ingenieurswese, en kritiekeketting-ondersoek met betrekking tot die bydrae wat elk tot die versnelling van die uitvoeringsfase van ingenieursprojekte kan lewer. Elk van hierdie benaderings kan
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish in the Journal agree to the following terms:- Authors retain copyright and grant the Journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the Journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this Journal.