Kuhn, C. and Visser, J. K. (2014) “MANAGING UNCERTAINTY IN TYPICAL MINING PROJECT STUDIES”, The South African Journal of Industrial Engineering, 25(2), pp. 105–120. doi: 10.7166/25-2-800.