Oyetunji, E. O. and Oluleye, A. E. (2011) “NEW HEURISTICS FOR MINIMISING TOTAL COMPLETION TIME AND THE NUMBER OF TARDY JOBS CRITERIA ON A SINGLE MACHINE WITH RELEASE TIME”, The South African Journal of Industrial Engineering, 21(2). doi: 10.7166/21-2-53.