Naidoo, E., Padayachee, J. and Bright, G. (2018) “A MULTI-STAGE OPTIMISATION METHOD FOR THE MANAGEMENT OF AN ON-DEMAND FIXTURE MANUFACTURING CELL FOR MASS CUSTOMISATION PRODUCTION SYSTEMS”, The South African Journal of Industrial Engineering, 29(2), pp. 52–64. doi: 10.7166/29-2-1824.