Dass, S. and Steyn, H. (2011) “AN EXPLORATORY ASSESSMENT OF PROJECT DURATION IN MULTIPLE-PROJECT SCHEDULES WHERE RESOURCES ARE ALLOCATED BY THE THEORY OF CONSTRAINTS METHOD”, The South African Journal of Industrial Engineering, 17(1). doi: 10.7166/17-1-156.