DU TOIT, A.; JOOSTE, J. L.; CONRADIE, P. D. F. IMPROVING THE RESPONSE TIME FOR THE CORRECTIVE MAINTENANCE OF RAIL INFRASTRUCTURE: A CASE STUDY OF THE WESTERN CAPE PASSENGER RAIL NETWORK. The South African Journal of Industrial Engineering, [S. l.], v. 30, n. 1, p. 235–247, 2019. DOI: 10.7166/30-1-1909. Disponível em: https://sajie.journals.ac.za/pub/article/view/1909. Acesso em: 24 nov. 2024.