Kuhn, C., & Visser, J. K. (2014). MANAGING UNCERTAINTY IN TYPICAL MINING PROJECT STUDIES. The South African Journal of Industrial Engineering, 25(2), 105–120. https://doi.org/10.7166/25-2-800