[1]
Grobbelaar, S. and Visser, J.K. 2015. DETERMINING THE COST OF PREDICTIVE COMPONENT REPLACEMENT IN ORDER TO ASSIST WITH MAINTENANCE DECISION-MAKING. The South African Journal of Industrial Engineering. 26, 1 (May 2015), 150–162. DOI:https://doi.org/10.7166/26-1-713.