[1]
Oyetunji, E.O. and Oluleye, A.E. 2011. NEW HEURISTICS FOR MINIMISING TOTAL COMPLETION TIME AND THE NUMBER OF TARDY JOBS CRITERIA ON A SINGLE MACHINE WITH RELEASE TIME. The South African Journal of Industrial Engineering. 21, 2 (Nov. 2011). DOI:https://doi.org/10.7166/21-2-53.