[1]
Pellissier, R. and Kleynhans, A. 2011. BPR AND ERP: THE CHICKEN OR THE EGG. The South African Journal of Industrial Engineering. 10, 1 (Nov. 2011). DOI:https://doi.org/10.7166/10-1-371.