[1]
Yadavalli, V., Bekker, A., Mostert, P. and Botha, M. 2011. BAYESIAN HIGHEST POSTERIOR DENSITY INTERVALS FOR THE AVAILABILITY OF A SYSTEM WITH A ’REST-PERIOD’ FOR THE REPAIR FACILITY. The South African Journal of Industrial Engineering. 12, 2 (Nov. 2011). DOI:https://doi.org/10.7166/12-2-345.