[1]
Çetinkaya, F.C., Çatmakaş, H.A. and Görür, A.K. 2019. SINGLE-MACHINE SCHEDULING OF THE INDIVISIBLE MULTI-OPERATION JOBS. The South African Journal of Industrial Engineering. 30, 1 (May 2019), 78–93. DOI:https://doi.org/10.7166/30-1-2017.