[1]
Du Toit, A., Jooste, J.L. and Conradie, P.D.F. 2019. IMPROVING THE RESPONSE TIME FOR THE CORRECTIVE MAINTENANCE OF RAIL INFRASTRUCTURE: A CASE STUDY OF THE WESTERN CAPE PASSENGER RAIL NETWORK. The South African Journal of Industrial Engineering. 30, 1 (May 2019), 235–247. DOI:https://doi.org/10.7166/30-1-1909.