Mwanga, Y., J. Joubert, and V. Yadavalli. “A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR”. The South African Journal of Industrial Engineering, vol. 20, no. 1, Nov. 2011, doi:10.7166/20-1-83.