Kazemipoor, H., Tavakkoli-Moghaddam, R. and Shahnazari-Shahrezaei, P. (2013) “Solving a novel multi-skilled project scheduling model by scatter search”, The South African Journal of Industrial Engineering, 24(1), pp. 121–135. doi: 10.7166/24-1-651.