Reinecke, A. and Page, D. (2011) “PREDICTING SEQUENCE DEPENDENT SET-UP TIMES FOR MULTISTATION MACHINES (A CASE STUDY)”, The South African Journal of Industrial Engineering, 9(1). doi: 10.7166/9-1-381.