Geekie, A. and Steyn, H. (2011) “BUFFER SIZING FOR THE CRITICAL CHAIN PROJECT MANAGEMENT METHOD”, The South African Journal of Industrial Engineering, 19(1). doi: 10.7166/19-1-107.