Mwanga, Y., Joubert, J. and Yadavalli, V. (2011) “A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR”,
The South African Journal of Industrial Engineering
, 20(1). doi: 10.7166/20-1-83.