Turner, V. and Pauw, J. (2011) “DOES THE MRP LOGIC WORK FOR FINITE CAPACITY PLANNING AND OPERATIONS SCHEDULING?”,
The South African Journal of Industrial Engineering
, 5(2). doi: 10.7166/5-2-417.