Reinecke, A.E., and D.C. Page. 2011. “PREDICTING SEQUENCE DEPENDENT SET-UP TIMES FOR MULTISTATION MACHINES (A CASE STUDY)”. The South African Journal of Industrial Engineering 9 (1). https://doi.org/10.7166/9-1-381.