Mwanga, Y.A., J.W. Joubert, and V.S.S Yadavalli. 2011. “A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR”.
The South African Journal of Industrial Engineering
20 (1). https://doi.org/10.7166/20-1-83.