Turner, V.K, and J.C.H. Pauw. 2011. “DOES THE MRP LOGIC WORK FOR FINITE CAPACITY PLANNING AND OPERATIONS SCHEDULING?”.
The South African Journal of Industrial Engineering
5 (2). https://doi.org/10.7166/5-2-417.