REINECKE, A.; PAGE, D. PREDICTING SEQUENCE DEPENDENT SET-UP TIMES FOR MULTISTATION MACHINES (A CASE STUDY). The South African Journal of Industrial Engineering, [S. l.], v. 9, n. 1, 2011. DOI: 10.7166/9-1-381. Disponível em: http://sajie.journals.ac.za/pub/article/view/381. Acesso em: 29 apr. 2024.