DURANDT, C.; SMIT, E. V. der M.; DU PREEZ, N. D. EXPLOITING DETERMINISTIC MAINTENANCE OPPORTUNITY WINDOWS CREATED BY CONSERVATIVE ENGINEERING DESIGN RULES THAT RESULT IN FREE TIME LOCKED INTO LARGE HIGH-SPEED COUPLED PRODUCTION LINES WITH FINITE BUFFERS. The South African Journal of Industrial Engineering, [S. l.], v. 27, n. 2, p. 132–146, 2016. DOI: 10.7166/27-2-1370. Disponível em: http://sajie.journals.ac.za/pub/article/view/1370. Acesso em: 26 nov. 2024.