Turner, V., & Pauw, J. (2011). DOES THE MRP LOGIC WORK FOR FINITE CAPACITY PLANNING AND OPERATIONS SCHEDULING?. The South African Journal of Industrial Engineering, 5(2). https://doi.org/10.7166/5-2-417