Yadavalli, V., Bekker, A., Mostert, P., & Botha, M. (2011). BAYESIAN HIGHEST POSTERIOR DENSITY INTERVALS FOR THE AVAILABILITY OF A SYSTEM WITH A ’REST-PERIOD’ FOR THE REPAIR FACILITY. The South African Journal of Industrial Engineering, 12(2). https://doi.org/10.7166/12-2-345