Du Toit, A., Jooste, J. L., & Conradie, P. D. F. (2019). IMPROVING THE RESPONSE TIME FOR THE CORRECTIVE MAINTENANCE OF RAIL INFRASTRUCTURE: A CASE STUDY OF THE WESTERN CAPE PASSENGER RAIL NETWORK. The South African Journal of Industrial Engineering, 30(1), 235–247. https://doi.org/10.7166/30-1-1909