Mwanga, Y., Joubert, J., & Yadavalli, V. (2011). A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR.
The South African Journal of Industrial Engineering
,
20
(1). https://doi.org/10.7166/20-1-83