Reinecke, A., & Page, D. (2011). PREDICTING SEQUENCE DEPENDENT SET-UP TIMES FOR MULTISTATION MACHINES (A CASE STUDY). The South African Journal of Industrial Engineering, 9(1). https://doi.org/10.7166/9-1-381