[1]
Reinecke, A. and Page, D. 2011. PREDICTING SEQUENCE DEPENDENT SET-UP TIMES FOR MULTISTATION MACHINES (A CASE STUDY). The South African Journal of Industrial Engineering. 9, 1 (Nov. 2011). DOI:https://doi.org/10.7166/9-1-381.