[1]
Coelho, M., Chakraborti, S. and Graham, M.A. 2015. A COMPARISON OF PHASE I CONTROL CHARTS. The South African Journal of Industrial Engineering. 26, 2 (Aug. 2015), 178–190. DOI:https://doi.org/10.7166/26-2-1026.