[1]
Mwanga, Y., Joubert, J. and Yadavalli, V. 2011. A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR.
The South African Journal of Industrial Engineering
. 20, 1 (Nov. 2011). DOI:https://doi.org/10.7166/20-1-83.