[1]
Menon, R.B., Shalij, P.R., Sajeesh, P., Tom, G. and Pramod, V.R. 2021. COST VALUE-STREAM MAPPING AS A LEAN ASSESSMENT TOOL IN A SURGICAL GLOVE MANUFACTURING COMPANY. The South African Journal of Industrial Engineering. 32, 1 (May 2021), 157–170. DOI:https://doi.org/10.7166/32-1-2368.