[1]
Dass, S. and Steyn, H. 2011. AN EXPLORATORY ASSESSMENT OF PROJECT DURATION IN MULTIPLE-PROJECT SCHEDULES WHERE RESOURCES ARE ALLOCATED BY THE THEORY OF CONSTRAINTS METHOD. The South African Journal of Industrial Engineering. 17, 1 (Nov. 2011). DOI:https://doi.org/10.7166/17-1-156.