[1]
Viljoen, P.J. and Steyn, H. 2011. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION. The South African Journal of Industrial Engineering. 18, 1 (Nov. 2011). DOI:https://doi.org/10.7166/18-1-134.