[1]
Durandt, C., Smit, E.V. der M. and Du Preez, N.D. 2016. EXPLOITING DETERMINISTIC MAINTENANCE OPPORTUNITY WINDOWS CREATED BY CONSERVATIVE ENGINEERING DESIGN RULES THAT RESULT IN FREE TIME LOCKED INTO LARGE HIGH-SPEED COUPLED PRODUCTION LINES WITH FINITE BUFFERS. The South African Journal of Industrial Engineering. 27, 2 (Aug. 2016), 132–146. DOI:https://doi.org/10.7166/27-2-1370.