A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR

Authors

  • Y.A. Mwanga Institute of Statistics and Applied Economics, Makerere University
  • J.W. Joubert Department of Industrial & Systems Engineering, University of Pretoria; Built Environment Council for Scientific and Industrial Research (CSIR)
  • V.S.S Yadavalli Department of Industrial & Systems Engineering, University of Pretoria

DOI:

https://doi.org/10.7166/20-1-83

Abstract

ENGLISH ABSTRACT: It is reasonable to expect that preparation time is needed to ready a repair facility before a repair can be carried out. A three-unit system with a `preparation time

Downloads

Download data is not yet available.

Downloads

Published

2011-11-05

How to Cite

Mwanga, Y., Joubert, J., & Yadavalli, V. (2011). A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR. The South African Journal of Industrial Engineering, 20(1). https://doi.org/10.7166/20-1-83

Issue

Section

General Articles