A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR
DOI:
https://doi.org/10.7166/20-1-83Abstract
ENGLISH ABSTRACT: It is reasonable to expect that preparation time is needed to ready a repair facility before a repair can be carried out. A three-unit system with a `preparation time
Downloads
Download data is not yet available.
Downloads
Published
2011-11-05
How to Cite
Mwanga, Y., Joubert, J., & Yadavalli, V. (2011). A COMPLEX THREE-UNIT PARALLEL SYSTEM WITH PREPARATION TIME FOR REPAIR. The South African Journal of Industrial Engineering, 20(1). https://doi.org/10.7166/20-1-83
Issue
Section
General Articles
License
Authors who publish in the Journal agree to the following terms:- Authors retain copyright and grant the Journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the Journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this Journal.