DOES THE MRP LOGIC WORK FOR FINITE CAPACITY PLANNING AND OPERATIONS SCHEDULING?

V.K Turner, J.C.H. Pauw

Abstract


ENGLISH ABSTRACT: During the past five years, MRP based systems have increasingly been criticized for their inability to reduce inventory levels, meet due dates and to plan at an operational level. This paper suggests that the actual reasons for these problems are some fundamental flaws in the MRP logic and its assumptions. The logic of the optimized Production Technology (OPT) is suggested as an alternative approach that addresses the limitations of MRP based systems.

AFRIKAANSE OPSOMMING: Gedurende die afgelope vyf jaar het kritiek teen MRP-gebaseerde sisteme toegeneem. Die kritiek is hoofsaaklik dat MRP-sisteme vooraadvlakke nie voldoende verminder nie; beplande datums nie haal nie en ook nie op In operasionele vlak beplan nie. Hierdie artikel wil voorstel dat die rede hiervoor fundamentele foute in die MRP logika en aannames is. Die logika van "optimized Production Technology" (OPT) word as alternatief voorgestel, aangesien dit die probleemareas in die MRP-logika aanspreek.


Full Text:

PDF


DOI: https://doi.org/10.7166/5-2-417

Refbacks

  • There are currently no refbacks.




Copyright (c) 2015 The South African Journal of Industrial Engineering


ISSN 2224-7890 (on-line) ; ISSN 1012-277X (print)


Powered by OJS and hosted by Stellenbosch University Library and Information Service since 2011.


Disclaimer:

This journal is hosted by the SU LIS on request of the journal owner/editor. The SU LIS takes no responsibility for the content published within this journal, and disclaim all liability arising out of the use of or inability to use the information contained herein. We assume no responsibility, and shall not be liable for any breaches of agreement with other publishers/hosts.

SUNJournals Help