GOAL PROGRAMMING MODEL FOR PRODUCTION PLANNING IN A TOOTHPASTE FACTORY

Authors

  • A.D. Adeyeye Department of Industrial and Production Engineering, University of Ibadan
  • O.E. Charles-Owaba Department of Industrial and Production Engineering, University of Ibadan

DOI:

https://doi.org/10.7166/19-2-102

Abstract

ENGLISH ABSTRACT: The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%.

AFRIKAANSE OPSOMMING: Die GP-model is ontwikkel vir die beplanning van produksie van

Downloads

Published

2011-11-05

How to Cite

Adeyeye, A., & Charles-Owaba, O. (2011). GOAL PROGRAMMING MODEL FOR PRODUCTION PLANNING IN A TOOTHPASTE FACTORY. The South African Journal of Industrial Engineering, 19(2). https://doi.org/10.7166/19-2-102

Issue

Section

General Articles